Coleman Engineering put together a design build team and led design efforts for this extensive analysis and design of upgrades to an existing stormwater pump station. This project was completed as part of a design build team with Syblon-Reid Construction of Folsom, CA. The project included the analysis of stormwater flows versus pumping capacity of the existing pump station. Careful demonstration of the existing and future capacities were required to convince the City that the desired plan would be sufficient. Final improvements included the replacement of two diesel engines with 600 hp electric motors, the addition of a new emergency diesel generator, and replacement of much of the existing electrical service and panels.