Brentwood DN Tanks Project

Project Overview

Coleman Engineering has successfully provided planning; preliminary and final design engineering; preparation of construction plans and technical specifications, bid phase services and engineering services during construction to the City of Brentwood over the last 15 years, including two partially buried, 4-million-gallon DN Tanks pre-stressed concrete water storage reservoirs:

  • Reservoir 1.3: Design and engineering-services-during-construction-phase services for a partially buried 4-million-gallon DN Tanks pre-stressed concrete water storage reservoir.
  • Reservoir 2.3: Design and engineering-services-during-construction engineering services for a partially buried 4-million-gallon DN Tanks pre-stressed concrete water storage reservoir.

Key Challenges & Solutions

These design projects had to be fast-tracked to meet development schedules, while still considering the City’s long-term operations and maintenance requirements. We were able to deliver these projects on budget and schedule and to the requisite quality through regular and pro-active engagement and communication with the City team.

Team Members

  • Chad Coleman – Principal-in-Charge; Design Phase Project Manager
  • Simon Gray – ESDC Phase Project Manager
  • Cody Tom – ESDC Project Engineer
Client:
City of Brentwood
Location:
Brentwood, CA
Date:
Top

Inquiries? Get in touch today!

Give us a call to talk about a project or about employment opportunities with Coleman Engineering. We look forward to hearing from you.

CONTACT ADDRESS
1223 Pleasant Grove Boulevard
Suite 100, Roseville, CA 95678

GENERAL INQUIRIES

info@coleman-eng.com

PHONE
916-791-1188

SOCIAL MEDIA