Coleman Engineering designed a 450,000 square foot pond liner and pond drain pump station. Formerly, the pond was used as a percolation basin but when that was no longer allowed, the City needed to line the pond and provide a means to pump the stored water back to the plant headworks.
The design process included topographical and geotechnical surveying and Civil Engineering for pond excavation, grading and liner design details. Working with an experienced team of subconsultants, Coleman Engineering was able to provide power to the pump station using existing electrical systems and also integrate the required contacts in the pump station into the existing plant SCADA system using the existing wireless network.
Project Relevance
Lining an existing pond
Grading design to remove existing sediment and maximize storage
Select the best liner material for the given conditions