While working at another engineering firm, Chad Coleman was the Project Manager responsible for the design and construction engineering services for a partially buried 4 million gallon pre-stressed concrete water storage reservoir. The reservoir was served by a booster pump station designed by Chad Coleman and it supplied a hydropneumatic pump station also designed by Chad Coleman.