Coleman Engineering provided assistance to this small private water company to improve their system. The project included a new supply connection to a neighboring water system, and distribution system improvements.
The significance of the new connection was to design a way to automate the operations using a pressure reducing valve plumbed as an altitude valve with a delay so that it would keep an elevated tank full and turned over sufficiently. The project was designed on a very small budget to fit within funding and budget limits.