Professionals at Coleman Engineering provided design services for a new lift station required to serve a new multi-family development. The lift station was made necessary to avoid other utility conflicts on the site. A simple duplex grinder pump arrangement was utilized to make long term maintenance simple for the facility which was to be owned and operated by the Homeowners Association.