Red Hawk Casino WWTP

Project Overview

Coleman Engineering is retained by Red Hawk Casino to provide 24 hour wastewater operations services.

The wastewater plant is designed as a 0.25 MGD membrane bio-reactor (MBR) facility, utilizing Kubota membranes, that produces effluent that meets Title 22 standards. Effluent is used for toilet flushing, landscape irrigation, and leachfield/sprayfield disposal. An on-site belt press system is utilized for sludge processing and disposal. This facility is not under a waste discharge or NPDES permit but has been operated as it is under a permit in order to maintain consistency with other permitted facilities he managed, as well as in the event that a permit was required in the future. The potable water for the facility is provided by El Dorado Irrigation District and consists of a 0.50 MG potable water storage tank, booster pump station, fire flow booster station and the capability of treating with sodium hypochlorite for disinfection if needed. This facility reporting consisted of compliance sampling/reporting required by the EPA. A local laboratory, CLS, provides all lab testing of the samples collected at the facility.

Client:
Red Hawk Casino
Location:
Placerville, CA
Date:
Top

Inquiries? Get in touch today!

Give us a call to talk about a project or about employment opportunities with Coleman Engineering. We look forward to hearing from you.

CONTACT ADDRESS
1223 Pleasant Grove Boulevard
Suite 100, Roseville, CA 95678

GENERAL INQUIRIES

info@coleman-eng.com

PHONE
916-791-1188

SOCIAL MEDIA