Coleman Engineering led the engineering analysis of a new water supply option for the Shadow Lakes Golf Course. The golf course received water from a higher cost City connection that was not officially allocated for this use. Irrigation water was available relatively close to the site so this assessment was made to determine the feasibility and estimated construction costs of such a connection. Following the successful feasibility assessment, Coleman Engineering designed and provided construction engineering services for the new pump station. Facilities included a turnout structure on an existing 48-inch concrete pipe and a new wet well with submersible pumps.