Shadow Lakes Irrigation Pump Station

Coleman Engineering led the engineering analysis of a new water supply option for the Shadow Lakes Golf Course. The golf course received water from a higher cost City connection that was not officially allocated for this use. Irrigation water was available relatively close to the site so this assessment was made to determine the feasibility and estimated construction costs of such a connection. Following the successful feasibility assessment, Coleman Engineering designed and provided construction engineering services for the new pump station. Facilities included a turnout structure on an existing 48-inch concrete pipe and a new wet well with submersible pumps.

Client:
Shadow Lakes Golf Course
Location:
Brentwood, CA
Date:
Top

Inquiries? Get in touch today!

Give us a call to talk about a project or about employment opportunities with Coleman Engineering. We look forward to hearing from you.

CONTACT ADDRESS
1223 Pleasant Grove Boulevard
Suite 100, Roseville, CA 95678

GENERAL INQUIRIES

info@coleman-eng.com

PHONE
916-791-1188

SOCIAL MEDIA