Coleman Engineering was retained by Lennar Homes to design a new sewer pump station to accommodate varying flow conditions in line with the project buildout.
The sewer pump station included a pre-cast concrete wet-well sized to accommodate a buildout flow of 1.15 MGD, triplex, submersible, solids handling pumps and emergency overflow storage. The design also featured full electrical and controls including premium duty pump motors with variable frequency drives, standby generator, flow meters and full SCADA.
Once the design was completed, Coleman Engineering provided full engineering services during bidding and construction.