Coleman Engineering designed and provided construction engineering services for a 1,000 gpm municipal well with a depth of 380-feet and a diameter of 16-inches to provide a clean water source to serve the irrigation needs of the Cannery development. Eaton Drilling was the drilling contractor on this well.
The well features a submersible pump and is located outside so that it is easy to maintain. Discharge is directly into the irrigation system which uses a hydropneumatic tank to control pump motor cycling. A pilot well was drilled so that cuttings could be obtained and an e-log could be performed. Both were used to produce a final well filter pack and screen design based on site specific conditions.